Monday, 6 April 2020

Bridge Day 6

Bridge final step

I finished last time in a bit of a dilemma, how to but joint the wire rope guard rails.  Following discussions at my railway club monthly meeting I tried to use what is commonly known as a Choc Box connector.  This did the job but I was not really pleased with the look when fitted in place.



So after some considerable thought I came up with this.  A 1" length of 2.5mm aluminium tubing filled with superglue was I my opinion the answer. 





    

No comments:

Post a Comment