Thursday, 12 March 2020

Bridge Day 3

Got round to having another go. So it's time for the hand rail posts to be fitted. After calculating, measuring and marking out a start was made on cutting and preparing the necessary number of posts. then after filling everything up it was time to move on to the drop drill. So a small jig was put together to enable all the holes to match accurately. It was at this point I made another jig to drill the holes needed later for the wire safety rail I intent to use.
 


It was starting to look something like a bridge now so I thought it was time to take it out to see what it looked like in place.

                   











Not looking too bad so back to the workshop to start the other side,     

  Another day. 