Saturday, 29 February 2020

Bridge Day 2



Day two of this bridge build was only a short work period.  I spent time measuring and calculating the right position of the hinge pin. After some research I found out that this pin position should be a minimum of 5mm above the rail head.





Having deliberately left the main rail bed support runners 4" over length at one end it was now time to cut off and fix the over hinge.





No comments:

Post a Comment